Calculator
Fully loaded labor + materials + overhead + processing. What most contractors forget when quoting.
Net margin on this job
43.4%
$282 gross profit on a $650 ticket
Labor cost
2h × $72/hr (fully loaded)
- $143
Materials cost
Your cost
- $120
Overhead allocation
Office, insurance, truck, software
- $85
Payment processing
3.1% of ticket
- $20
Total cost
Sum of above
- $368
How to read this
More tools
Five questions. Three recommendations. The fastest way to narrow a 30-tool shortlist.
Open →
Real annual cost of ownership — subscription plus processing, add-ons, and implementation.
Open →
Annual savings from better dispatch software across admin time, drive time, missed calls, and close rate.
Open →